CONSTRUCTION BLOG: HEYDAY HOMES: Buzz Court
→First Floor Framing
by
Kevin 03/19/12
First floor walls are up and the engineered joists have been delivered and will be installed in the next couple of days. The engineered joist and beams are not only stronger than typical wood but they are pre-cut at the factory to reduce jobsite waste.
While it looks like the buildings are going up quickly, which they are, the tricky details like the stairs have yet to be installed. It seems like whenever framing gets going people expect the buildings to be done soon but this is still the beginning.

