CONSTRUCTION BLOG: DICK + JANE


Framing and Roofing Complete


by
Kevin 10/26/10


The framing has been completed for a couple weeks but before we could get the roof on some early rain came and delayed us for a bit. All the rough inspections have been signed off and the roof is now on. Insulation will begin this week and drywall will start early next week.
image

image




Buildings and their Construction Blogs

HEYDAY HOMES: Buzz Court

Six LEED Rated Homes in Silver Lake

Framing 98% Complete 05/15/12

All the homes are framed at this point. The roofs will go on soon as well as the windows and…

MEP Being Installed 04/25/12

Mechanical, electrical, and plumbing are being installed in the first two homes:
image

HEYDAY HOMES: Buzz Court

HEYDAY HOMES: Ellenwood

19 LEED Rated Townhomes in Eagle Rock.

SOLD 08/17/11


HEYDAY HOMES: Ellenwood

DICK + JANE

Two Homes in Echo Park.

COMPLETE 05/01/11


DICK + JANE

ROCK ROW

15 LEED Platinum + Gold Townhomes in Eagle Rock.

COMPLETE 02/24/11


ROCK ROW

B(L)OX

A renovated duplex in Echo Park.

COMPLETE 09/02/07


B(L)OX

JACK + JILL

Two homes in Lincoln Heights.

COMPLETE 02/10/06


JACK + JILL

4xFOURPLEX

An apartment building in Echo Park.

COMPLETE 10/27/04


4xFOURPLEX

A+D Museum Installation

Installation at Architecture + Design Museum. Summer 2011

See the video 08/22/11


A+D Museum Installation
Read full Heyday blog