CONSTRUCTION BLOG: DICK + JANE
Archives
COMPLETEBoth Homes in Contract!
OPEN HOUSE MARCH 13 FROM 1-4PM // Posted on
Interior Stair
Stucco
Countertops
Interior Stair
Stucco Siding
Drywall, Siding, Tile
Drywall
Wrapped
Framing and Roofing Complete
Facade Framing
Framing Nearing Completion
Framing Has Begun
Slabs Poured
Underground Plumbing
Eastsider LA Interview
Waterproofing and Tomatoes
Second Garage Poured
First Garage Poured
Formwork
Footings Poured
Dick + Jane are Underway
Excavation Continues
Excavation
Groundbreaking!
Land Acquired
Subscribe
→Slabs Poured
by
Kevin 08/04/10
We are finally out of the ground! The slabs were poured today and the project finally looks like something.
Here they are placing the last couple of yards of concrete. The pour took 45 yards for both houses which is 5 trucks of concrete. Warren (the guy holding the hose) is the pump operator. We've been working with him for about 8 years on all our hillside projects. He pumps the concrete from the truck to the slab and then the concrete sub finishes it. The slab shown has two layers of massive #8 rebar (the steel that works in tension with the compressive strength of the concrete) which is 1" thick.
The obvious things to look out for are: #1: Is all your structural hardware in the right location #2 Is all your rough plumbing in the right location #3 Are the slabs level
Finishing the slab with the whirly bird and beginning to remove the formwork.