We are finally out of the ground! The slabs were poured today and the project finally looks like something.

Here they are placing the last couple of yards of concrete. The pour took 45 yards for both houses which is 5 trucks of concrete. Warren (the guy holding the hose) is the pump operator. We've been working with him for about 8 years on all our hillside projects. He pumps the concrete from the truck to the slab and then the concrete sub finishes it. The slab shown has two layers of massive #8 rebar (the steel that works in tension with the compressive strength of the concrete) which is 1" thick.
image

The obvious things to look out for are: #1: Is all your structural hardware in the right location #2 Is all your rough plumbing in the right location #3 Are the slabs level
image

Finishing the slab with the whirly bird and beginning to remove the formwork.
image




Buildings and their Construction Blogs

HEYDAY HOMES: Buzz Court

Six LEED Rated Homes in Silver Lake

Framing 98% Complete 05/15/12

All the homes are framed at this point. The roofs will go on soon as well as the windows and…

MEP Being Installed 04/25/12

Mechanical, electrical, and plumbing are being installed in the first two homes:
image

HEYDAY HOMES: Buzz Court

HEYDAY HOMES: Ellenwood

19 LEED Rated Townhomes in Eagle Rock.

SOLD 08/17/11


HEYDAY HOMES: Ellenwood

DICK + JANE

Two Homes in Echo Park.

COMPLETE 05/01/11


DICK + JANE

ROCK ROW

15 LEED Platinum + Gold Townhomes in Eagle Rock.

COMPLETE 02/24/11


ROCK ROW

B(L)OX

A renovated duplex in Echo Park.

COMPLETE 09/02/07


B(L)OX

JACK + JILL

Two homes in Lincoln Heights.

COMPLETE 02/10/06


JACK + JILL

4xFOURPLEX

An apartment building in Echo Park.

COMPLETE 10/27/04


4xFOURPLEX

A+D Museum Installation

Installation at Architecture + Design Museum. Summer 2011

See the video 08/22/11


A+D Museum Installation
Read full Heyday blog