Kevin 07/30/10


We're almost out of the ground on D+J. And on a hillside project like this once the foundations are in and the slabs are poured the rest is all downhill.
In this picture the plumbing is in and the rebar and anchor bolts are in position (bottom of pic with 2x4 bracing). The retaining wall in the foreground is the elevation change between the living room and dining room. The retaining wall in the background is the back of the house behind the kitchen cabinets.

image




Buildings and their Construction Blogs

HEYDAY HOMES: Buzz Court

Six LEED Rated Homes in Silver Lake

Framing 98% Complete 05/15/12

All the homes are framed at this point. The roofs will go on soon as well as the windows and…

MEP Being Installed 04/25/12

Mechanical, electrical, and plumbing are being installed in the first two homes:
image

HEYDAY HOMES: Buzz Court

HEYDAY HOMES: Ellenwood

19 LEED Rated Townhomes in Eagle Rock.

SOLD 08/17/11


HEYDAY HOMES: Ellenwood

DICK + JANE

Two Homes in Echo Park.

COMPLETE 05/01/11


DICK + JANE

ROCK ROW

15 LEED Platinum + Gold Townhomes in Eagle Rock.

COMPLETE 02/24/11


ROCK ROW

B(L)OX

A renovated duplex in Echo Park.

COMPLETE 09/02/07


B(L)OX

JACK + JILL

Two homes in Lincoln Heights.

COMPLETE 02/10/06


JACK + JILL

4xFOURPLEX

An apartment building in Echo Park.

COMPLETE 10/27/04


4xFOURPLEX

A+D Museum Installation

Installation at Architecture + Design Museum. Summer 2011

See the video 08/22/11


A+D Museum Installation