CONSTRUCTION BLOG: DICK + JANE
Archives
COMPLETEBoth Homes in Contract!
OPEN HOUSE MARCH 13 FROM 1-4PM // Posted on
Interior Stair
Stucco
Countertops
Interior Stair
Stucco Siding
Drywall, Siding, Tile
Drywall
Wrapped
Framing and Roofing Complete
Facade Framing
Framing Nearing Completion
Framing Has Begun
Slabs Poured
Underground Plumbing
Eastsider LA Interview
Waterproofing and Tomatoes
Second Garage Poured
First Garage Poured
Formwork
Footings Poured
Dick + Jane are Underway
Excavation Continues
Excavation
Groundbreaking!
Land Acquired
Subscribe
→Underground Plumbing
by
Kevin 07/30/10
We're almost out of the ground on D+J. And on a hillside project like this once the foundations are in and the slabs are poured the rest is all downhill.
In this picture the plumbing is in and the rebar and anchor bolts are in position (bottom of pic with 2x4 bracing). The retaining wall in the foreground is the elevation change between the living room and dining room. The retaining wall in the background is the back of the house behind the kitchen cabinets.