Inside: 4xFOURPLEX


This is Heyday’s first project, which broke ground in 2002. The $50,000 hillside lot was across the street from a crack-house which deterred other buyers. The structure is based on a 20’x12.5’ module in which each module has a distinct function. The translucent polycarbonate skin wraps public areas and the cement board covers private bedrooms and baths. Featured as part of the L.A. Forum ‘On the Map’ Lecture Series.

CONSTRUCTION BLOG: 4xFOURPLEX


PLANS APPROVED!

by
Kevin 07/09/03


After a fair amount of back and forth with the city the plans are finally approved. The building is the largest possible to design as an unlicensed architect: 4 units and 2 stories. The two story rule was really tricky since the building steps up the hill. At first the plan checker said it was 4 stories! After perusing the definition of a basement and tapping an obscure code rule known as the "split building rule" which was recommended by Jay Vanos, the building is officially two stories. On to construction...


Framing Near Completion

by
Kevin 05/30/03


Framing is 95% complete with just the parapet walls left to finish. The mechanical, electrical, and plumbing is about 50% complete at this point and the roof will be torched on within a week or two.


Plan Check Corrections

by
Kevin 04/15/03


Picked up the plans from the building department today. At first glance the amount of red ink on the drawings looks like someone was murdered. However, upon closer look most of the notes are minor or misunderstandings. Plan checker is Suzanne Kusik.


Plans Submitted to Building Department

by
Kevin 03/06/03


Should take about a month for review and corrections. Fingers crossed that there are no glaring rookie mistakes.


Putting Our $$$ Where Our Mouth Is

by
Kevin 09/23/02


We closed on the first ever Heyday property today. For $55,000 we bought a hillside piece of land in Echo Park, about a mile from downtown Los Angeles. The lot is 40' wide x 140' deep.
image
Upon visiting our beautiful new investment we found a few people camping on the site. They were gangsters that had been evicted from the house across the street after a shootout. Not feeling so hot about the purchase at the moment.


<< Previous Page

    

Buildings and their Construction Blogs

HEYDAY HOMES: Peak Place

Six LEED Rated Homes in Glassell Park

Slab City 05/14/13

Three slabs down, three to go.



image

Site Grading and Foundations 05/01/13

The foundation footings are currently being formed and we hope to pour them in the next couple days. Unlike most…

HEYDAY HOMES: Peak Place

HEYDAY HOMES: Rennie

Three LEED Rated homes in Venice

Retaining Walls 05/02/13

The retaining walls for the sunken courtyards are being formed. Since the walls surround the courtyard and extend to the…

$ in the Ground 04/04/13

We poured the footings for one of the houses today. It took 30 yards of concrete, which happens to cost…

HEYDAY HOMES: Rennie

HEYDAY HOMES: Buzz Court

Six LEED Rated Homes in Silver Lake

COMPLETE 12/06/12


HEYDAY HOMES: Buzz Court

HEYDAY HOMES: Ellenwood

19 LEED Rated Townhomes in Eagle Rock.

SOLD 08/17/11


HEYDAY HOMES: Ellenwood

DICK + JANE

Two Homes in Echo Park.

COMPLETE 05/01/11


DICK + JANE

ROCK ROW

15 LEED Platinum + Gold Townhomes in Eagle Rock.

COMPLETE 02/01/10


ROCK ROW

B(L)OX

A renovated duplex in Echo Park.

COMPLETE 09/02/07


B(L)OX

JACK + JILL

Two homes in Lincoln Heights.

COMPLETE 02/10/06


JACK + JILL

4xFOURPLEX

An apartment building in Echo Park.

COMPLETE 10/27/04


4xFOURPLEX

A+D Museum Installation

Installation at Architecture + Design Museum. Summer 2011

See the video 08/22/11


A+D Museum Installation
Read full Heyday blog