Heyday Construction Blog


Interior Stair

by Kevin 01/18/11
category: DICK + JANE

The interior stair is installed and structurally sound. It is about 90% complete. A cantilevered bookshelf is still being made and will be installed soon. Pedro, the master craftsman himself, is off to the left in the photo.

image



Stucco

by Kevin 01/13/11
category: DICK + JANE

The final coat of stucco was applied this morning. The cedar facade on the right is also coming along nicely.

image



Countertops

by Kevin 01/07/11
category: DICK + JANE

The countertops were installed today.
The main items left for completion are now: flooring, decking, facade, stairs, landscaping. The finish line is not right around the corner but it is in sight.

image

The underside of the island will be painted to match the cabinets.
image



Teaser Alert: Heyday’s Next Project…

by Kevin 01/06/11
category: NEWS/EVENTS

Our next project is ready for plan check submission. Further information and full launch coming soon....

image

image



Interior Stair

by Kevin 01/04/11
category: DICK + JANE

The interior staircase is well on its way. Once complete it will be a lightweight combination of plywood and solid timber that will be seen as its own element serving as a connection between the ground floor and second floor. It is hard to explain, final images will be posted in a week or two upon completion.

image