It’s Permanent Now: Footings Poured
by Kevin 02/29/12category: HEYDAY HOMES: Buzz Court
If breaking ground is the "Houston we have lift off" moment, and project completion is the lunar landing, then pouring concrete is the stage in between when the booster rockets disengage from the space shuttle: you realize that if everything isn't right now then it probably never will be.

Foundations Formed
by Kevin 02/25/12category: HEYDAY HOMES: Buzz Court
Form-work, string lines, rebar, hold-downs: Starting to look like a construction site not just a hole in the ground.

Foundation Excavation
by Kevin 02/21/12category: HEYDAY HOMES: Buzz Court
Hardy discussing the excavation with the subcontractor on lot 1...

And Zoe inspecting the work on lot 2+3.


And Zoe inspecting the work on lot 2+3.

Foundation Layout
by Kevin 02/16/12category: HEYDAY HOMES: Buzz Court
A little muddy this week but the soil has been compacted, grading completed, and the building corners have been staked by the surveyor...

The foundation sub has begun laying out the footings by tying a string line between the stakes the surveyor set and measuring offset points from the string. Once those points are set, the areas are delineated with chalk for the excavator to follow.


The foundation sub has begun laying out the footings by tying a string line between the stakes the surveyor set and measuring offset points from the string. Once those points are set, the areas are delineated with chalk for the excavator to follow.

Buzz Court Breaks Ground!
by Kevin 02/07/12category: NEWS/EVENTS
Our six home project on Rowena Ave. in Silver Lake is officially under construction!
Check in frequently to the project link (top picture on the right) to see how we are progressing...

Check in frequently to the project link (top picture on the right) to see how we are progressing...