
Framing Nearing Completion
by Kevin 06/19/13category: HEYDAY HOMES: Peak Place
Three of the homes are done and the other three are about a week away.

Framing + Formwork
by Kevin 06/19/13category: HEYDAY HOMES: Rennie
Framing is done for the second floor on the first two units:

(And yes that is a grocery cart being used as our drawing table)
Concrete formwork o the back unit:

(And yes that is a grocery cart being used as our drawing table)
Concrete formwork o the back unit:
Hardy Speaking at USC
by Kevin 06/19/13category: Homepage Slideshow
Tomorrow Hardy is speaking on a panel at the Ross Minority Program in Real Estate.
Kevin Speaking at AIA Workshop
by Kevin 06/10/13category: NEWS/EVENTS
This Friday Kevin will be speaking as part of the "Architect as Small-Scale Developer" workshop. Since tickets are only $110 it should be at least as entertaining as a trip to Disney Land.
Seriously, the workshop intends to give other architects and designers the guidelines to develop their own projects as an alternative to only working for clients. The other speakers have done some really nice projects and hopefully the workshop gives someone the much needed understanding they need to launch a project on their own.
More info. here.
Seriously, the workshop intends to give other architects and designers the guidelines to develop their own projects as an alternative to only working for clients. The other speakers have done some really nice projects and hopefully the workshop gives someone the much needed understanding they need to launch a project on their own.
More info. here.
Put A Peak On It
by Kevin 06/05/13category: HEYDAY HOMES: Peak Place
Second floor framing is up and the roof framing is scheduled to go up later this week. The master bedroom has a 16' high cathedral ceiling with a nice loft space above the closet where the kiddies can hang out and build forts.


Next Page >>
