Completed in 2012. Six homes in Silver Lake. All are LEED Platinum.
October 14, 2012 Solar Panels Installed
September 14, 2012 Good Evening
August 9, 2012 Fins!
August 6, 2012 Exterior Siding
August 3, 2012 Cabinets Installed
July 11, 2012 Panel Layout
July 3, 2012 Fin Mock-Up
June 12, 2012 Drywall Installed on Lot 1
June 9, 2012 Insulation
May 15, 2012 Framing 98% Complete
April 25, 2012 MEP Being Installed
April 10, 2012 Third Floor Framing Complete
March 30, 2012 Crane
Hired a crane to place the steel beams on the rear houses.
March 19, 2012 First Floor Framing
March 10, 2012 Steel
February 29, 2012 It's Permanent Now: Footings Poured
February 25, 2012 Foundations Formed
February 21, 2012 Foundation Excavation
February 16, 2012 Foundation Layout
February 7, 2012 Groundbreaking
August 12, 2011 Plans to be submitted September 1st
If all goes as planned we'll be breaking ground in late October/November.